A one million-square foot fabrication facility for Foxconn Technology Group was constructed in Wisconsin. Construction manager Gilbane/Exyte built a power substation and the main manufacturing facility on about 750 acres. Connecting the construction community required creating a labor and supply chain network for the campus itself.
The project excavation team had 27 companies involved. There was an intensive focus on the job to create and bring the best team of trade contractors to the table for each one of the bid packages.